Real customer-grade samples, tooling fixtures, and CAD station layouts with zero third-party identifiers.

4 verified engineering visuals
High-density single-end NTC leads aligned on standard carrier
02 High-density single-end NTC leads aligned on standard carrier
Parallel terminal crimping & stripping finishing cell
03 Parallel terminal crimping & stripping finishing cell
3-axis overhead linear carrier transfer gantry CAD
04 3-axis overhead linear carrier transfer gantry CAD

Station architecture and quality gates

5 connected process stages engineered for repeatable cycle time and inline verification.

  1. ST-01 3,000 PCS/H

    High-Speed Wire Cutting & Boarding Machine

    Quality gate: Sized specifically for 30,000 PCS/10h shift with zero buffer starvation

  2. ST-02 3,000 PCS/H

    High-Speed Single-End NTC Welding Machine

    Quality gate: Stable micro-weld geometry ready for batch dip encapsulation

  3. ST-03 6,000–7,000 PCS/H

    Automated Batch Dip Encapsulation & Curing Logistics

    Quality gate: Uniform multi-pass sealing with smooth cart-to-oven flow

  4. ST-04 4,000–5,000 PCS/H

    Automated Shell Loading & Epoxy Potting Station

    Quality gate: Consistent resin fill depth without manual hand-syringing

  5. ST-05 3,000–4,000 PCS/H

    Automated Hi-Pot & Resistance Sorting + Terminal Units

    Quality gate: 100% electrical verification with zero manual sorting mix-ups

Before vs. after workshop economics (4 metrics)
Operational impact comparison for PRJ-ROI-07: 30,000 PCS/Day Single-End NTC Finishing Line — 22 Positions Reduced
MetricManual baselineAutomated lineOperational impact
Total Manual Headcount ~28 operators to hit 30,000 PCS/day6.2 online operators (~22 roles reduced)78% direct labor cut
Front-End Weld Speed Manual hand-soldering (~400 PCS/H/person)3,000 PCS/H cutting + 3,000 PCS/H welding7.5× per-station speed
Carrier & Fixture Sizing Ad-hoc trays causing frequent oven delays5,000 boards + 120 frames + 150 potting + 40 test fixturesZero line starvation
Financial Payback High annual labor overhead & overtime spikesVerified ~16-month payback on full line + toolingPredictable CAPEX return
Footprint, utilities and technical parameters (6 specs)
Verified mechanical, electrical, and tooling specifications for PRJ-ROI-07
Engineering parameterVerified specification
Daily Line Capacity 30,000 finished single-end NTC sensors / 10h shift
Front-End Speed 3,000 PCS/H wire cutting & boarding + 3,000 PCS/H single-end welding
Encapsulation & Potting 6,000–7,000 PCS/H encapsulation + 4,000–5,000 PCS/H shell potting
EOL Testing & Terminals 3,000–4,000 PCS/H auto Hi-Pot/resistance + 1,200–1,500 PCS/H semi-auto terminal units
Full Tooling Ecosystem 5,000 wire boards · 120 encapsulation frames · 10 carts · 150 potting fixtures · 40 test fixtures
Staffing & Payback 6.2 online operators · ~22 manual positions reduced · ~16-month documented payback
Detailed station notes, root bottlenecks and Shenzhen FAT criteria

Root bottlenecks solved

  • High-speed 3,000 PCS/H front-end demand quickly overwhelmed manual cutting and single-end welding.
  • Insufficient carrier board and curing-frame buffers stalled ovens and starved downstream shell potting.
  • Factory leadership needed an integrated fixture + equipment budget with clear <18-month ROI.

Shenzhen FAT acceptance gates

  • 3,000 PCS/H wire cutting and single-end welding verified synchronously on full-length customer wire.
  • Complete 5,000-board & 120-frame circulation logistics modeled and verified against curing oven batch times.
  • 3,000–4,000 PCS/H Hi-Pot and resistance sorting verified separating 100% of seeded defective units.
  • 6.2-operator shift workflow validated during factory acceptance sign-off.

Full station engineering breakdown

ST-01

High-Speed Wire Cutting & Boarding Machine

Continuous multi-wire payoff, stripping, tinning, and board alignment backed by a 5,000-board circulation pool.

ST-02

High-Speed Single-End NTC Welding Machine

Matched 1:1 to front-end wire prep speed for continuous high-yield single-end element welding.

ST-03

Automated Batch Dip Encapsulation & Curing Logistics

Single machine covers dual-pass coating supported by 120 encapsulation frames and 10 mobile turnover carts.

ST-04

Automated Shell Loading & Epoxy Potting Station

1 high-speed potting machine cycling 150 precision potting fixtures continuously through curing.

ST-05

Automated Hi-Pot & Resistance Sorting + Terminal Units

1 automated electrical tester with 40 turnover test fixtures, feeding semi-automatic terminal & plastic-seat cells (1,200–1,500 PCS/H each).

Direct OEM engineering desk in Shenzhen and Kunshan

Need a line similar to PRJ-ROI-07?

Share your sensor drawing and target daily output for a 48-hour layout and payback estimate.